Connect with us

South Florida Local News

Closure of westbound exit ramp at hiatus road on state road 862/i-595 scheduled for April 23 and 24, 2025

Published

on

Broward County, Florida – Drivers in Broward County should plan for temporary detours later this month, as the Florida Department of Transportation (FDOT) has announced the closure of the SR 862/I-595 westbound exit ramp to Hiatus Road (Exit 3). This closure will take place on Wednesday night, April 23, and Thursday night, April 24, 2025, from 9 p.m. to 5 a.m. each night, as part of ongoing safety improvements to the state’s transportation system.

The closure is necessary to accommodate directional bore operations and the installation of new “Wrong-Way” signage. FDOT officials are urging drivers to take note of the temporary changes to traffic patterns and plan accordingly.

During the closure, traffic will be detoured through a specific route to ensure safe travel around the construction zone. Motorists traveling westbound on SR 862/I-595 will be directed to Exit 2, which leads to SR 823/Flamingo Road. From there, drivers will make a U-turn at Flamingo Road and head eastbound on SR 84 to reconnect with Hiatus Road. Florida Highway Patrol (FHP) officers will be stationed on-site to monitor traffic flow and assist with any issues that may arise. Additionally, ample signage will be placed along the detour route to guide motorists safely through the area.

Read also: Pedestrian struck and killed while crossing Northwest 31st Avenue in Oakland Park on Saturday evening

This construction is part of a broader initiative by FDOT aimed at improving safety on Florida’s highways. The project is a key element of FDOT’s Wrong-Way Driving Initiative, designed to reduce the occurrence of wrong-way driving incidents that can lead to severe crashes. As part of this effort, the department is installing flashing beacons, new wrong-way signage, and advanced Intelligent Transportation System (ITS) devices at 23 exit ramps along major roadways including SR 9/I-95, SR 93/I-75, and SR 862/I-595.

The goal of these improvements is to detect and prevent wrong-way drivers from entering the highway system, which has been identified as a significant safety concern. The new technology will be integrated with the Regional Transportation Management Center (RTMC), enabling real-time monitoring and faster alerts to both motorists and law enforcement about potential wrong-way driving situations. The upgrades will also include enhanced signage and pavement markings, which are designed to improve visibility and extend the lifespan of road infrastructure.

This safety initiative comes as part of an ongoing effort to ensure Florida’s roadways remain safe, resilient, and efficient for years to come. FDOT has been proactive in seeking community feedback, working with local residents to strike a balance between the public’s transportation needs and the vision for their communities. This collaborative approach helps ensure that FDOT’s projects align with the priorities and concerns of those who use the roads every day.

The construction project, which started in August 2024, is expected to be completed by Summer 2025. With an estimated cost of $5,626,065, this safety enhancement project is one of several initiatives in Broward County designed to improve traffic management and prevent accidents on the road.

Read also: Pompano Beach City Commission and CRA to hold special joint meeting on April 30 to discuss downtown redevelopment

For more information or to address any concerns regarding the closure and detour, drivers can contact FDOT Project Manager Christopher Comprosky, P.E., at 954-547-2807 or via email at [email protected]. Updates on the project and any changes to the detour routes will also be made available on the FDOT website and through other communication channels to keep the public informed.

FDOT urges all motorists to drive carefully and follow all posted signs and detour instructions during the closure. The department appreciates the community’s patience and cooperation as these important safety measures are put into place to enhance travel for all road users in the area.

 

South Florida Local News17 hours ago

August launches Florida’s child safety awareness month with renewed focus on protecting students

South Florida Local News17 hours ago

Florida beachgoers urged to protect sea turtle hatchlings and shorebirds during the holiday weekend

South Florida Local News17 hours ago

Blaise Ingoglia visits Duval County on ninth stop of statewide hurricane preparedness tour

South Florida Local News1 day ago

Pompano Beach to mark the 25th anniversary of 9/11 with an evening of remembrance

South Florida Local News1 day ago

Roy Rogers Seawall Project brings major waterfront improvements and stronger public access to Pompano Beach

South Florida Local News1 day ago

Pine Crest student-athlete Julia Hlatki selected to 2026 U.S. Girls’ U15 Youth National Lacrosse Team

South Florida Local News2 days ago

West Palm Beach announces final 2026 session of The Next Level PANEL focused on leadership and lasting community impact

South Florida Local News2 days ago

Fort Lauderdale issues traffic advisory ahead of Labor Day Festival scheduled for September 6

South Florida Local News2 days ago

World’s largest contract logistics provider GXO Logistics to establish new regional office in Fort Lauderdale

South Florida Local News4 days ago

Weston at 30 history podcast launches September 3 with stories from the city’s early years

South Florida Local News4 days ago

Snook recreational harvest season opens September 1 across most of Florida

South Florida Local News4 days ago

Fort Lauderdale United FC and Gainbridge support South Florida families with $9,900 YMCA donation

South Florida Local News5 days ago

Oakland Park opens new Greenleaf Park downtown with basketball tennis pickleball and family recreation spaces

South Florida Local News5 days ago

Pembroke Pines prepares for its 3rd Annual Hispanic Heritage Festival with music food and cultural celebrations

South Florida Local News5 days ago

Sewer pump station B-4 improvements continue as additional rehabilitation work pushes completion into early 2027

Categories

Trending